Wimozee Technology’s shop on Woodfield Street, Morriston was fitted out in about three weeks.
The work included:
- Electrics: wiring prepared before the fit-out.
- Carpentry: shop displays and racking fitted.
- Decorating: the shop finished in black and green.
This Daffodil Decor project brought the trades together on one schedule.
Call 01792 223 223 to discuss your shop fit-out and arrange a free quote.
Reviews for the Daffodil Team
The Wimozee project at a glance
Wimozee Technology’s fit-out on Woodfield Street took about three weeks on site, with electrics, carpentry and decorating on one schedule.
- Area: Morriston, Swansea
- Property: Retail unit, Woodfield Street
- Time on site: About three weeks
- Trades: Electrics 3 working days, carpentry 7 working days, decorating 5 working days
- Finish: Black and green, inside and out
- Project record: Daffodil Decor project account
A retail unit to prepare for opening
Wimozee Technology, a tech and electronics retailer, took on a shop on Woodfield Street. Stock had a fixed arrival date, followed by the planned opening.
The unit needed electrical work, treatment of water-ingress staining in one corner, and a display layout for the stock.

One plan for the fit-out

Wimozee originally planned to book electricians, carpenters and decorators separately. Instead, the trades worked to one schedule, so the electrical work, displays and black-and-green finish could be planned around the two dates.
For similar projects, see our shop fitting service.
Planning a shop fit-out?
Discuss your premises and arrange a free quote.
Electrical preparation before the fit-out
The electrical work took three working days. It included a fuse-box rewire and wiring for internal and external security and motion cameras.
This first fix put the wiring in place before display panels and paint covered the walls. Carpentry could then start without reopening finished surfaces.
Building the retail displays
Carpentry took seven working days and prepared the shop to display its stock:
- Racking: a frame supported the inventory displays.
- Pipework: boxing concealed it within the layout.
- Walls and fittings: boards were cut to size, fixtures fitted and skirting repositioned.
The completed display layout was ready for decorating.
Decorating the shopfront and interior
Decorating took five working days and covered the shopfront, the full interior, the back office, the toilet and the kitchen, all finished in the brand’s black and green. Black framed the displays, and luminous green ran across the feature walls.
A separate signage team worked alongside as its own trade, fitting the box sign as the decorating stage finished.
Bring your shop plans together
Talk through the changes you want for your premises.
One programme for three trades
Electrics, carpentry and decorating ran on one schedule with one point of contact, and each trade started once the previous stage was ready. The client received a weekly update across the stages, and the job finished within the agreed window.
1
Electrics
Completed first, so the carpenters started on a unit with its services in place.
2
Carpentry
Handed the decorators a finished display layout to paint around.
3
Decorating
Closed the job, with the signage team fitting the box sign as the stage ended.
For Wimozee, one schedule and one point of contact reduced the work of booking and handing over between trades. Explore our commercial refurbishment and shop fitting services, or browse more projects.
Planning a refurbishment project?
Tell us about your premises, the work you have in mind and your timing. Call 01792 223 223 or use the form below to arrange a visit and a free quote.
Get My Free Quote
Fill in the form below for a free quote:
Daffodil Property Refurbishment works with an independent local refurbishment partner, who visits, quotes and carries out the agreed work.